Building a new home, cabin, garage, or structure in Winchester? Before it can be occupied, it needs a site address — the “fire number” that identifies your property for emergency responders, mail, and mapping.

Fire numbers are assigned by Vilas County, but there are a few Town and County requirements to complete first. The whole process usually takes 6 weeks to 6 months depending on weather, workload, and how quickly each agency responds. This page breaks down the process step by step.

Typical Timeline

Steps 1–4 (permits + address application) can take 2–8 weeks, depending on your responsiveness and Board meeting schedules. Steps 5–6 (fee + sign installation) can take another 6 weeks to 6 months.

How to Get Your Address

Follow these steps in order. Each step must be completed before proceeding to the next.

1

Get a Driveway / Access Permit

A driveway or access permit is required from the appropriate jurisdiction before an address can be assigned.

Existing driveway? A new permit may not be required. Contact the Town Clerk at (715) 686-2123 to confirm.
2

Obtain a County Zoning Permit

Vilas County does not address vacant land. A structure or sanitary zoning permit is required before an address can be assigned — this demonstrates your intent to develop the property. Permits are issued through the Vilas County Zoning Department.

Vilas County Zoning / Planning Dept. 330 Court Street
Eagle River, WI 54521
(715) 479-3620
Building Inspector
Rick Clem
RC Inspection Agency LLC
8735 Highway 47
Woodruff, WI 54568
(715) 439-4222
Office Hours:
Monday 8–11am
Wednesday 8–11am
Thursday 8–11am
3

Mark Your Driveway

Before your address application is submitted, make sure the location of your driveway is clearly identified where it intersects the named road. The Town of Winchester will perform your fire number sign installation after the address is assigned, so the driveway must be easy to locate.

Some examples are: a wooden stake, a section of PVC pipe painted bright orange, or a stake with surveyor's flagging tape.

4

Submit the Vilas County Address Application

Once your driveway permit, zoning permit, and driveway markings are in order, submit the Uniform Address Application to the Vilas County Land Information Office. The application is completed online.

5

Pay the Fire Number Fee

After your address has been assigned by Vilas County, pay the fire number fee to the Town of Winchester. This covers the cost of your fire number sign and its installation.

6

Sign Installation

Once your address is assigned and your fee is received, the Town of Winchester will fabricate and install your fire number sign at your driveway location. Installation times can vary significantly — from approximately 6 weeks to 6 months — depending on weather, workload, and other factors. You can call the Town Clerk's office at any time for a status update.

After Your Sign Is Installed

Optional: New addresses can take weeks, months, or even years to appear in Google Maps and Apple Maps automatically. To speed things up, you can submit yours directly:

Frequently Asked Questions

Have a question not covered here? Contact the Town Clerk or the Vilas County Addressing Coordinator.

The address assignment itself typically takes at least two weeks after a complete application is submitted to Vilas County. The overall timeline also depends on how long it takes to obtain your driveway and zoning permits, and the process can take longer if there are issues with existing addresses or if a road needs to be named. After your address is assigned and fire number fee is paid, sign installation times can vary significantly — from approximately 6 weeks to 6 months — depending on weather, workload, and other factors. You can call the Town Clerk's office at any time for an update on your sign.
No. Vilas County does not assign addresses to vacant land. You must obtain either a structure or sanitary zoning permit first, which demonstrates intent to develop the property.
Existing driveways may not require a new permit. Contact the Town Clerk to confirm whether your existing driveway access requires a permit for address assignment purposes.
All applications are evaluated for completeness and accuracy. Information that is found to be false, inaccurate, or incomplete may result in a delay or denial of the address assignment. If an address is incorrectly assigned due to incomplete or incorrect application information, a reassignment may be required.
The Town of Winchester handles the fabrication and installation of your fire number sign after the address is assigned and the fire number fee is paid. You do not need to purchase or install the sign yourself. Installation times can range from approximately 6 weeks to 6 months depending on weather and other factors — call the Town Clerk's office anytime for a status update.
The Town needs to know the exact location where your driveway intersects the named road in order to install the fire number sign in the correct spot. A clearly marked driveway prevents delays and incorrect sign placement.

Town Clerk

Town of Winchester

(715) 686-2123

Contact the Town Clerk

County Addressing

Kyle Larson

(715) 479-3755

kylars@vilascountywi.gov

County Zoning

Vilas County

(715) 479-3620